From
JED
To
B1
JeddahMechanical — Airframes & Engines (B1)
- Passenger
- Abdullah Saad Al-Qahtani
- Campaign
- Technicians 2026
- Preferences
- 1 / 3
- Documents
- 3 / 5
67%
Next gate
Additional details
Still missing
Application
Registration closes in 8 daysDeadline 20 October 2026
From
JED
To
B1
Next gate
Additional details
Still missing
Step 7 of 10
A preliminary check of each preference, based on your verified data.
A preliminary result from your verified data. Final eligibility is computed on submission and after document review.
Track
Mechanical — Airframes & Engines (B1) · B1
Nationality
Required: Saudi
Required: Saudi
Your data: ···
Age at programme start
Required: 18–27 years
Required: 18–27 years
Your data: ···
Qualification
Required: High school (science)
Required: High school (science)
Your data: ···
Minimum high school average
Required: ≥ 75%
Required: ≥ 75%
Your data: ···
Qudurat (aptitude)
Required: ≥ 65
Required: ≥ 65
Your data: ···