SA 003AdmissionRegistration open

Aircraft Maintenance Technicians Admission 2026

The hands that keep the fleet flying — Part-66 maintenance technicians.

Registration
15 September – 20 October 2026
Seats
100
Tracks
2
Results
10 December 2026

Registration closes in

08days
13hours
39minutes
59seconds

Deadline 20 October 2026, 11:59 pm

About the campaign

Admission of Part-66 maintenance technicians to the B1 (mechanical) and B2 (avionics) tracks. Registration open until 20 October.

Campaign type
Admission
Sign-in
Nafath, or national ID with an SMS one-time code
Application fee
No fee
Preferences
Up to 3 preferences
Ranking your preferences
Optional
Preference edit deadline
22 October 2026
Combining with other campaigns
Allowed with: Pilots 2026, ATC 2026

Tracks & seats

You choose your track when you apply. Each track has its own seats and conditions.

  • B1

    Mechanical — Airframes & Engines (B1)

    60seats
    Award:
    Part-66 maintenance licence — category B1
    Duration:
    24 months
    Where:
    Jeddah & Riyadh

    Key conditions

    • Age 18–27
    • average ≥ 75%
    • Qudurat ≥ 65
    • technical aptitude ≥ 60
  • B2

    Avionics (B2)

    40seats
    Award:
    Part-66 maintenance licence — category B2
    Duration:
    24 months
    Where:
    Jeddah

    Key conditions

    • Age 18–27
    • average ≥ 75%
    • Qudurat ≥ 65

Admission conditions

In plain words: this is what you need in order to apply.

  1. 1

    You are a Saudi national.

  2. 2

    You are aged 18 to 27 on the programme start date (17 January 2027).

  3. 3

    You hold a science-stream high school certificate or a diploma, with an average of at least 75%.

  4. 4

    Your Qudurat (aptitude) score is at least 65, and the result is no older than 5 years.

  5. 5
    During the campaign

    You pass the Technical aptitude test with 60 or more during the testing stage.

Your scores and qualification are fetched from Qiyas and Muahal — no need to type them in.

Required documents

Have them ready before you start. Shared documents are uploaded once and reused across your campaigns.

5 required · 1 optional

  • National ID copy

    RequiredShared across campaigns

    Both sides, clearly legible

    PDF · JPG · PNGUp to 5 MB

  • High school certificate

    RequiredShared across campaigns

    Certified by the Ministry of Education

    PDFUp to 10 MB

  • Academic transcript

    RequiredShared across campaigns

    Full secondary-school record

    PDFUp to 10 MB

  • Personal photo

    RequiredShared across campaigns

    White background, recent

    JPG · PNGUp to 2 MBIssued within 6 months

  • Medical report

    Required

    General fitness, issued within 3 months

    PDFUp to 10 MBIssued within 3 months

  • Diploma certificate

    OptionalShared across campaigns

    For diploma holders

    PDFUp to 10 MB

Campaign dates

From registration to programme start. The current stage is lit.

  1. Registration

    15 September – 20 October 2026

  2. Preference edit deadline

    22 October 2026

  3. Verification, eligibility & review

    15 September – 26 October 2026

  4. Tests

    28 – 29 October 2026

  5. Interviews

    8 – 19 November 2026

  6. Results announcement

    10 December 2026

  7. Programme start

    17 January 2027

Questions about this campaign

When are results announced?

Results are announced on 10 December 2026 and reach you in your portal, by SMS and by email.

Can I apply to other campaigns too?

Yes — you can combine it with Pilots 2026, ATC 2026, up to 3 preferences ranked by your priority.

Can I change my preferences after submitting?

Yes, until 22 October 2026. After that, preferences are locked.

How do I sign in?

Nafath, or national ID with an SMS one-time code

Is there an application fee?

No, applying to every campaign is free.

How many preferences can I choose?

Up to three, in campaigns that allow concurrent applications, ranked by your priority.

What if my Qiyas or STEP result doesn't appear?

You can continue and upload the supporting document; we review manually — no application is rejected because of a technical failure.

Other campaigns you may like

Registration open

Deadline 20 October 2026

Apply now