Airport Fire & Rescue Training 2026
First to arrive, last to leave — airport rescue & fire-fighting crews.
- Registration
- 20 September – 25 October 2026
- Seats
- 35
- Tracks
- 1
- Results
- 1 December 2026
This campaign is temporarily paused
Applications are temporarily paused while fitness requirements are updated. Your application is saved; we will notify you when we resume.
About the campaign
Training of airport rescue & fire-fighting crews. Paused since 8 October to review medical-fitness requirements with Civil Defence.
- Campaign type
- Training
- Sign-in
- Nafath, or national ID with an SMS one-time code
- Application fee
- No fee
- Preferences
- One preference
- Ranking your preferences
- Optional
- Combining with other campaigns
- Not allowed — apply to this campaign only
Tracks & seats
A single programme with no tracks — capacity and conditions are set for the whole campaign.
Airport Rescue & Fire Fighting
35seats- Award:
- Airport rescue & fire-fighting certificate
- Duration:
- 6 months
- Where:
- Dammam
Key conditions
- Age 18–28
- average ≥ 70%
- Qudurat ≥ 60
- fitness ≥ 70
Admission conditions
In plain words: this is what you need in order to apply.
- 1
You are a Saudi national.
- 2
You are aged 18 to 28 on the programme start date (10 January 2027).
- 3
You hold a science-stream high school certificate or a diploma, with an average of at least 70%.
- 4
Your Qudurat (aptitude) score is at least 60, and the result is no older than 5 years.
- 5During the campaign
You pass the Physical fitness test with 70 or more during the testing stage.
Your scores and qualification are fetched from Qiyas and Muahal — no need to type them in.
Required documents
Have them ready before you start. Shared documents are uploaded once and reused across your campaigns.
6 required · 0 optional
National ID copy
RequiredShared across campaignsBoth sides, clearly legible
PDF · JPG · PNGUp to 5 MB
High school certificate
RequiredShared across campaignsCertified by the Ministry of Education
PDFUp to 10 MB
Academic transcript
RequiredShared across campaignsFull secondary-school record
PDFUp to 10 MB
Personal photo
RequiredShared across campaignsWhite background, recent
JPG · PNGUp to 2 MBIssued within 6 months
Medical report
RequiredGeneral fitness, issued within 3 months
PDFUp to 10 MBIssued within 3 months
Physical fitness certificate
RequiredFor fire & rescue programmes
PDFUp to 5 MBIssued within 6 months
Campaign dates
From registration to programme start. The current stage is lit.
Registration
20 September – 25 October 2026
Verification, eligibility & review
20 September – 30 October 2026
Tests
20 – 21 October 2026
Results announcement
1 December 2026
Programme start
10 January 2027
Registration
20 September – 25 October 2026
Verification, eligibility & review
20 September – 30 October 2026
Tests
20 – 21 October 2026
Results announcement
1 December 2026
Programme start
10 January 2027
Questions about this campaign
When are results announced?
Results are announced on 1 December 2026 and reach you in your portal, by SMS and by email.
Can I apply to other campaigns too?
No — this campaign does not allow concurrent applications to other campaigns.
How do I sign in?
Nafath, or national ID with an SMS one-time code
Is there an application fee?
No, applying to every campaign is free.
How many preferences can I choose?
Up to three, in campaigns that allow concurrent applications, ranked by your priority.
What if my Qiyas or STEP result doesn't appear?
You can continue and upload the supporting document; we review manually — no application is rejected because of a technical failure.
Other campaigns you may like
Temporarily paused
Applications are temporarily paused while fitness requirements are updated. Your application is saved; we will notify you when we resume.


