Applicant portal
Sign in with Nafath
ID number
Confirm in Nafath
Share data
Sign-in request for ID 1098••••47
Open Nafath and pick the number
We sent a verification request to the Nafath app linked to your ID. Pick the number that matches the one shown here.
Your number37
60 seconds left
- 1Open the Nafath app
- 2Pick number 37
- 3Confirm with fingerprint or face
Prototype controls


