- Qualification
- High school (science)
- Major
- Natural sciences
- Institution
- Technical College
- Graduation year
- 2022
- Overall grade
- 96.8%
My account
My profile
Your details as verified by official sources, your contact channels, your saved documents, and your rights over your personal data.
Identity details
Retrieved from Nafath and never edited by hand. If something changes in your civil record, refresh it from Nafath.
- Full name (Arabic)
- عبدالله بن سعد القحطاني
- Full name (English)
- Abdullah Saad Al-Qahtani
- National ID number
- 11•••••260
- Date of birth
- 18 March 2004 · 22 years
- Gender
- Male
- Nationality
- Saudi
Why can’t I edit these?
These details are taken from the official source to keep ranking fair. To fix an error, contact the Civil Affairs office, then press «Refresh from Nafath».
Contact details
Notifications and reminders go here. Mobile and email changes are confirmed with a one-time code first.
Mobile number
058 763 9555
Verified 4 July 2026
abdullah.qahtani17@gmail.com
Verified 4 July 2026
Preferred language
National address
Al-Faisaliyah district, King Abdullah St, building 1249 — Jeddah
Source: National Address (SPL)
Qualifications and test results
Retrieved automatically from Muahal, Qiyas and ETEC (STEP), with verification status and last update.
- Qudurat (aptitude)
- 86
- Tahsili (achievement)
- 83
- STEP
- 79
Document vault
Upload a document once and it is used across your applications. We warn you before it expires.
National ID copy
Acceptednational-id.pdf1.7 MBUploaded 2 August 2026
Used in 2 applications
Does not expireHigh school certificate
Acceptedhigh-school-certificate.pdf2 MBUploaded 2 August 2026
Used in 2 applications
Does not expireAcademic transcript
Acceptedtranscript.pdf2.4 MBUploaded 2 August 2026
Used in 2 applications
Does not expirePersonal photo
Acceptedphoto.jpg797 KBUploaded 2 August 2026
Used in 2 applications
Expires in 39 daysClass 1 medical certificate
Acceptedclass1-medical.pdf2.7 MBUploaded 2 August 2026
Used in 1 application
Expires in 250 daysMedical report
Acceptedmedical-report.pdf1.5 MBUploaded 4 July 2026
Used in 1 application
Expired 48 days agoYour current applications are not affected, but future campaigns will need a valid copy.
Privacy and your data rights
Under the Personal Data Protection Law you can see your data, download it, ask for corrections, and manage optional consents.
Your consents
Processing your data for admission
Needed to applySince 4 July 2026 · v3.1
Verifying your data with official sources
Needed to applySince 4 July 2026 · v3.1
SMS for reminders and alerts
Since 4 July 2026 · v3.1
Using your anonymised data to improve admissions
Since 2 August 2026 · v3.2
News about future campaigns
Since 2 August 2026 · v3.2
Consent and request history
You downloaded a copy of your data
10 August 2026 · 21:02Request DSR-2026-0291 — JSON + PDF, link expired after 7 daysYou accepted privacy notice v3.2
2 August 2026 · 18:40When applying to the Pilots 2026 campaignYou declined news about future campaigns
2 August 2026 · 18:40You can change this at any timeYou agreed to SMS messages
4 July 2026 · 16:27For reminders and urgent alertsYou accepted privacy notice v3.1
4 July 2026 · 16:26When you created your account with Nafath
Account and security
You always sign in with Nafath — your account has no password. Review the devices you are signed in on.
Last Nafath sign-in 12 October 2026 · 10:02
Active devices
Desktop · Windows 11This device
Chrome 141JeddahActive now
iPhone 15 · iOS 19
SafariJeddahLast active 11 October 2026 · 21:14
Laptop · macOS
Edge 140RiyadhLast active 2 October 2026 · 08:47
Don’t recognise a device? Sign it out and call us on 920000000.
Delete account
Available once your active campaigns end. You have an application in progress, so withdraw from «My application» first.


