My account

My profile

Your details as verified by official sources, your contact channels, your saved documents, and your rights over your personal data.

Identity details

Retrieved from Nafath and never edited by hand. If something changes in your civil record, refresh it from Nafath.

Nafath cannot be reached right now

Your saved details remain valid and your application is not affected. Try again in a few minutes. Trace ID: NFZ-7Q2K-0417
From NafathLast synced 12 October 2026 · 10:02
Full name (Arabic)
عبدالله بن سعد القحطاني
Full name (English)
Abdullah Saad Al-Qahtani
National ID number
11•••••260
Date of birth
18 March 2004 · 22 years
Gender
Male
Nationality
Saudi
Why can’t I edit these?

These details are taken from the official source to keep ranking fair. To fix an error, contact the Civil Affairs office, then press «Refresh from Nafath».

Contact details

Notifications and reminders go here. Mobile and email changes are confirmed with a one-time code first.

Mobile number

058 763 9555

Verified 4 July 2026

Email

abdullah.qahtani17@gmail.com

Verified 4 July 2026

Preferred language

National address

Al-Faisaliyah district, King Abdullah St, building 1249 — Jeddah

Source: National Address (SPL)

Qualifications and test results

Retrieved automatically from Muahal, Qiyas and ETEC (STEP), with verification status and last update.

MuahalVerified
Qualification
High school (science)
Major
Natural sciences
Institution
Technical College
Graduation year
2022
Overall grade
96.8%
Updated 4 July 2026
QiyasVerified
Qudurat (aptitude)
86
Tahsili (achievement)
83
Updated 4 July 2026
STEPVerified
STEP
79
Valid until July 2028

Document vault

Upload a document once and it is used across your applications. We warn you before it expires.

6 documents
  • National ID copy

    Accepted

    national-id.pdf1.7 MBUploaded 2 August 2026

    Used in 2 applications

    Does not expire
  • High school certificate

    Accepted

    high-school-certificate.pdf2 MBUploaded 2 August 2026

    Used in 2 applications

    Does not expire
  • Academic transcript

    Accepted

    transcript.pdf2.4 MBUploaded 2 August 2026

    Used in 2 applications

    Does not expire
  • Personal photo

    Accepted

    photo.jpg797 KBUploaded 2 August 2026

    Used in 2 applications

    Expires in 39 days
  • Class 1 medical certificate

    Accepted

    class1-medical.pdf2.7 MBUploaded 2 August 2026

    Used in 1 application

    Expires in 250 days
  • Medical report

    Accepted

    medical-report.pdf1.5 MBUploaded 4 July 2026

    Used in 1 application

    Expired 48 days ago

    Your current applications are not affected, but future campaigns will need a valid copy.

Privacy and your data rights

Under the Personal Data Protection Law you can see your data, download it, ask for corrections, and manage optional consents.

Your consents

  • Processing your data for admission

    Needed to applySince 4 July 2026 · v3.1

  • Verifying your data with official sources

    Needed to applySince 4 July 2026 · v3.1

  • SMS for reminders and alerts

    Since 4 July 2026 · v3.1

  • Using your anonymised data to improve admissions

    Since 2 August 2026 · v3.2

  • News about future campaigns

    Since 2 August 2026 · v3.2

Consent and request history

  1. You downloaded a copy of your data

    10 August 2026 · 21:02
    Request DSR-2026-0291 — JSON + PDF, link expired after 7 days
  2. You accepted privacy notice v3.2

    2 August 2026 · 18:40
    When applying to the Pilots 2026 campaign
  3. You declined news about future campaigns

    2 August 2026 · 18:40
    You can change this at any time
  4. You agreed to SMS messages

    4 July 2026 · 16:27
    For reminders and urgent alerts
  5. You accepted privacy notice v3.1

    4 July 2026 · 16:26
    When you created your account with Nafath

Account and security

You always sign in with Nafath — your account has no password. Review the devices you are signed in on.

Last Nafath sign-in 12 October 2026 · 10:02

Active devices

  • Desktop · Windows 11This device

    Chrome 141JeddahActive now

  • iPhone 15 · iOS 19

    SafariJeddahLast active 11 October 2026 · 21:14

  • Laptop · macOS

    Edge 140RiyadhLast active 2 October 2026 · 08:47

Don’t recognise a device? Sign it out and call us on 920000000.

Delete account

Available once your active campaigns end. You have an application in progress, so withdraw from «My application» first.